I finally started work on the major phase of my bedroom overhaul, and time management went completely out the window as the job I thought would only take a day to complete took a lot longer and I had to abort the project and clear the bathroom as it was required for my usual Friday bath <br /> <br />Instead of a product list, I'll list all the injuries and problems that befell me during those two days. <br /> <br />4 scratches (2 of which drew blood) <br />2 bruises <br />6 drawer rails that were installed the wrong way around and had to be rotated before I could fit the drawers <br />1 bookcase bottom that was fitted upside down <br />4 (or there abouts) screws that were a pain to screw into the bookcase <br />and 1 stripped screw head that couldn't be screwed all the way in <br /> <br />The actual list of products that were put together (and would have been if my time management didn't suck) will come in the video of this phase being completed.