Surprise Me!

Bridge Construction - Positioning a 400 ton bridge element

2016-07-27 7 Dailymotion

Here the new roadway element from the Freybridge is positioned below the remaining bridge structure, for the subsequent installation. <br />This bridge part was welded together 1.5 km upstream and then transport on a pontoon to the rest of existing bridge structure at the Heerstr. <br />More on my Channel.

Buy Now on CodeCanyon