BGC-ORTIGAS CENTER ROAD LINK<br /><br />This photo shows a portion of the Bonifacio Global City (BGC)-Ortigas Center road link project that connects the business hubs of Pasig and Taguig. The 1.481-kilometer road will be open to the public following its inauguration on Sept. 30, 2021. The road link is expected to reduce the one-hour travel time between BGC and Ortigas Center to only 12 minutes.<br /><br />Photos by John Orven Verdote<br /><br />Subscribe to The Manila Times Channel - https://tmt.ph/YTSubscribe<br /><br />Visit our website at https://www.manilatimes.net<br /><br />Follow us:<br />Facebook - https://tmt.ph/facebook<br />Instagram - https://tmt.ph/instagram<br />Twitter - https://tmt.ph/twitter<br />DailyMotion - https://tmt.ph/dailymotion<br /><br />Subscribe to our Digital Edition - https://tmt.ph/digital<br /><br />Check out our Podcasts:<br />Spotify - https://tmt.ph/spotify<br />Apple Podcasts - https://tmt.ph/applepodcasts<br />Amazon Music - https://tmt.ph/amazonmusic<br />Deezer: https://tmt.ph/deezer<br />Stitcher: https://tmt.ph/stitcher<br />Tune In: https://tmt.ph/tunein<br />Soundcloud: https://tmt.ph/soundcloud<br /><br />#TheManilaTimes