Surprise Me!

NAGPUR METRO COMPLETION OF PHASE 1 - PROUD OF NAGPUR - IS NAGPUR METRO PROJECT IS COMPLETED _

2024-03-26 5 Dailymotion

In yet another step that will revolutionize urban mobility, Prime Minister Narendra Modi dedicated ‘Nagpur Metro Phase I’ to the nation. He flagged off two metro trains - from Khapri to Automotive Square (Orange Line) and from Prajapati Nagar to Lokmanya Nagar (Aqua line) - at Khapri Metro Station. Phase I of the Nagpur Metro is developed at a cost of more than Rs 8650 crore. Prime Minister will also lay the foundation stone of Nagpur Metro Phase- II, which will be developed at a cost of more than Rs 6700 crore.<br /><br />The Phase-1 of Nagpur Metro comprises a 39-km-long elevated stretch, with 38 stations and two depots.<br /><br />The entire stretch has been divided into two corridors: North-South (Line-1) and East-West (Line-2).<br /><br />The 19.6-km-long North-South corridor with 18 stops will operate between Khapri and Automotive Square.<br /><br />The East-West corridor with a length of 18.5 km connects Prajapati Nagar in the eastern part of the city with Lokmanya Nagar in the western part of the city and has 20 stops.<br /><br />The detailed project report (DPR) of Nagpur Metro Phase-II for extending the existing 4 corridors of Phase-1.<br /><br />Nagpur Metro Rail Project Phase-II is scheduled to be completed in 2026. It consists of the following 4 extensions of 2 corridors of Phase I, totaling 43.8 km -<br /><br />i. MIHAN – MIDC ESR - 18.6 km<br />ii. Automotive Square – Kanhan River - 13.0 km<br />iii. Prajapati Nagar – Kapsi - 5.5 km<br />iv. Lokmanya Nagar – Hingna - 6.7 km<br /><br />Phase II will connect the satellite cities of Nagpur and highly benefit a population of over 10 lakh residing in these areas. When it is operational, the total length of the Nagpur Metro project will be 82 km.<br /><br />The 2 phases will collectively lead to an investment of Rs 15,388 crore. There will be a substantial increase in ridership after the Phase-II of Nagpur Metro is operational. The total ridership of the 2 phases after the completion of Phase II is expected to be 5.5 lakh daily. This is expected to increase to 6.3 lakh in 2031 and 7.7 lakh in 2041.<br /><br />Courtesy - Nagpur Metro<br /><br />Nagpur metro station<br />Nagpur metro song<br />Nagpur metro double decker flyover<br />Nagpur metro vlog<br />Nagpur metro job<br />Nagpur metro status<br />Nagpur metro vacancy <br />Nagpur metro route<br />Nagpur metro app<br />Nagpur metro phase 2<br />Nagpur metro status<br />Nagpur metro vacancy 2023<br />Nagpur metro vacancy 2022<br />Nagpur metro latest job<br />Nagpur Metro progress<br />नागपुर मेट्रो फेज 2 कब शुरू होगा?<br />क्या मेट्रो नागपुर में उपलब्ध है?<br />नागपुर मेट्रो टाइमिंग क्या हैं?<br />नागपुर में कितने मेट्रो स्टेशन हैं?<br />सबसे गहरा मेट्रो स्टेशन कौन सा है?<br />दुनिया का सबसे खूबसूरत मेट्रो स्टेशन कौन सा है?<br />भारत का सबसे लंबा मेट्रो स्टेशन कौन सा है?<br />नागपुर में कितने मेट्रो स्टेशन हैं?<br />Is Nagpur Metro project completed?<br />How long is Nagpur Metro Phase 1?<br />When Nagpur Metro Phase 2 will start?<br />Is Nagpur Metro in profit or loss?<br /><br />#trending #viral #instagram #love #explorepage #explore #instagood #fashion #follow #tiktok #like #likeforlikes #followforfollowback #photography #india #trend #instadaily #memes #music #style #trendingnow #reels

Buy Now on CodeCanyon