Prime Minister Datuk Seri Anwar Ibrahim on Saturday (May 4) witnessed the handing over of the Sultan Nazrin Shah 69 Commando Camp at Ulu Kinta, Perak <br /><br />The construction of the Sultan Nazrin Shah Camp started in 2018 at a cost of RM236 million and was built by the main contractor of the project, Syarikat Sujaman Sdn Bhd, while on 14 February, the camp received a certificate of completion and the 69 Commando operated there in stages.<br /><br />WATCH MORE: https://thestartv.com/c/news<br />SUBSCRIBE: https://cutt.ly/TheStar<br />LIKE: https://fb.com/TheStarOnline