Mallusk manufacturer Brett Martin has completed new projects with two of the English Premier League’s most prestigious football clubs.<br /><br />The world-leading plastics manufacturer provided high-performance, transparent polycarbonate roofing for refurbishments at Arsenal’s stadium as well as for the impressive new Everton ground at Bramley Moore Dock.<br /><br />The Newtownabbey company manufactured and installed replacement roofing for the Emirates Stadium in Holloway, London, which has been the home of Arsenal Football Club since 2006.<br /><br />The Emirates, a £390 million, 60,000-seat ground for which Brett Martin provided the roofing when it was originally built, was recently renovated. As part of the refurbishment, the crucial light-emitting roofing was replaced, and Brett Martin was again chosen as the preferred supplier. A total of 7,827 square meters of Brett Martin’s Marlon CS and Marlon FSX polycarbonate sheets were installed to refurbish the entire roof of the stadium.<br /><br />The Everton project saw Brett Martin provide the high-performance, transparent polycarbonate for the new £555 million stadium that is seen as key to the regeneration of that part of Merseyside.<br /><br />Covering over 6000 sq m of the stadium roof, the specialist polycarbonate material transmits sunlight through to the pitch, helping to ensure a high-quality surface for many of the world’s top footballers to play on.<br /><br />With the roof now complete, works on Everton’s stadium as a whole are due to be finished soon. The club are due to move to the new stadium from the start of next season.